Skip to main content
07816 434 770

Planning Permission for a Conservatory Explained

Most homes in England do not need planning permission for a conservatory if it fits within permitted development: single storey, within set depth and height limits, and covering no more than half the garden. Flats, listed buildings and conservation areas have tighter rules, so check with your local council before you build.

Planning permission for a conservatory: a new conservatory on a house in Derby

Written by AJB Windows Doors & Conservatories. Last reviewed: October 2026

At a glance

Usually needed?
No, if it is within permitted development
Depth limit (rear)
3 m for attached houses, 4 m for detached houses
Height limit
4 m, or 3 m at the eaves within 2 m of a boundary
Never permitted development
Flats and maisonettes
Building regulations
Usually exempt under 30 m² if separated from the house
Who to ask
Your local council planning team

Do I need planning permission for a conservatory?

Usually not. In England, a conservatory counts as a single-storey extension, so it can be built under permitted development rights without a planning application if it meets the size and position limits below.

Permitted development applies to houses only. Flats and maisonettes do not have these rights, so any conservatory on one needs planning permission.

What are the permitted development limits for a conservatory?

A conservatory stays within permitted development when it meets all of these limits:

The "original house" means the house as first built, or as it stood on 1 July 1948. Earlier extensions count towards these limits.

When does a conservatory need planning permission?

A conservatory needs planning permission when it goes beyond the limits above, or when permitted development rights do not apply. Common cases:

Does a conservatory need building regulations approval?

A conservatory is normally exempt from building regulations if all of these apply:

Building regulations exemption for conservatories (England)
ConditionWhat it means
Ground levelBuilt at ground level and single storey
Floor areaUnder 30 m²
Separated from the houseExternal-quality walls, doors or windows between the conservatory and the house
HeatingIndependent heating with its own temperature and on/off controls
Glazing and electricsGlazing and any fixed electrics still meet building regulations

Removing the wall or door between the house and the conservatory, or cutting a new opening, does need building regulations approval.

How do I check before I build?

Check in this order:

  1. Confirm the property type. Flats and maisonettes always need planning permission.
  2. Check for restrictions. Ask the council whether the house is listed, in a conservation area or covered by an Article 4 direction.
  3. Measure against the limits. Compare the planned depth, height and garden coverage with the permitted development limits.
  4. Get certainty if you need it. A Lawful Development Certificate from the council confirms the work is permitted development, which helps when you sell.
  5. Plan for building regulations. Decide whether the conservatory will be separated from the house; if not, building regulations apply.

For addresses in the city, the council is Derby City Council; elsewhere in Derbyshire it is your district or borough council.

Your questions answered

What else do people ask about planning permission for a conservatory?

Can I build a conservatory without planning permission?

Yes, in most cases. A single-storey conservatory on a house in England that stays within the permitted development limits for depth, height and garden coverage does not need a planning application.

How big can a conservatory be without planning permission?

A rear conservatory can project up to 3 m from the original house if it is attached, or 4 m if it is detached, and be up to 4 m high. Together with other extensions it must cover no more than half the garden.

Do I need planning permission for a conservatory in a conservation area?

Often yes. In a conservation area, side conservatories are not permitted development, and the council may have removed other rights. Check with your local council first.

Is a conservatory exempt from building regulations?

Usually yes, if it is single storey, under 30 m², separated from the house by external-quality walls or doors, and has independent heating. Its glazing and electrics must still meet the regulations.

What is a Lawful Development Certificate?

A Lawful Development Certificate is a document from your council confirming that the work is permitted development. It is optional, but it gives certainty and is useful when you sell the house.

AJB Windows installers fitting windows in Derby
Get in touch today

Need advice on your windows or doors?

Please don't hesitate to get in touch for any window or door installation work. No job is too big or small and we welcome all enquiries.